Thursday, November 3, 2011

WIP: teensy sweater #2


i closed the placket before blocking teensy sweater #2 so i could open up the lacy areas down the front, then i used a spray bottle to wet it.  the sleeves were not exactly the same size, so i worked on stretching out one of them to match.  someone told me recently that it might have behooved me to create both sleeves together the way socks can be made simultaneously.


2 comments:

  1. hahahaha - that someone wasn't ME! i am struggling with creating two-at-once. I am going to remind myself that it just LOOKS like it is less time. In reality, fussing with the long cable is taking 17 times longer than just knitting one sock and then the other one.

    they may have a point, but the frustration factor? OFF THE CHARTS!

    ReplyDelete